Jobsite readiness checklist Austin Polished Concrete Floors Fill this in for your actual project and the system you chose. A blank field doesn't count as an approval or a certification. [ ] Check safe access, the equipment route, utilities and the edges of the work area. [ ] Find out what the existing floor materials are. If you can't identify something, have it properly assessed before anyone disturbs it. [ ] Settle how the work area gets closed off from spaces in use, and plan dust control, ventilation, and waste. [ ] Check that the sample is approved, product conditions are met, and other trades are lined up in the right order. [ ] Write down who moves the furniture out and who puts it back. Area and contact: Access / power / water: Existing material assessment: Protection / dust / ventilation: Anything not ready and who fixes it: What must be done before we start: