Protecting polished floors during later work
Austin Polished Concrete Floors · Fill this in for your actual project and the system you chose. A blank field doesn't count as an approval or a certification.
- Use protection that's approved for the finish and the site. Keep grit from collecting under it.
- Don't put tape straight on the finished floor unless the chosen system's instructions allow it.
- Keep oil, paint, metal debris and wet materials off exposed areas.
- Spread heavy loads out and keep wheels clean. Lift equipment instead of dragging it.
- Check the protection often and report damage before covering it up.
What you type stays on this page and isn't sent or saved anywhere. Print it or save it as a PDF before you close the page.
Download blank text versionConcrete Polishing Council technical resources · Product document references